Same Machines.Same Operators. Same Shifts. But More Production.
What if you could see your shop floor performance Live? One screen. Like this?
What if you could see your shop floor performance Live?
One screen. Like this?
See where you gain, where you lose, and which machines and operators truly earn. Track production, OEE, downtime, and plan vs actual in real time. Tailored to your business, so decisions are faster and based on facts, not reports.
Trusted by 100 + machine shops in India & UK
From job shops to multi plant factories. Scales from 5 to 500 machines Most shops recover 10X the costs within weeks.
Gavin Price
MD Aarant Engineering
“Leanworx helped us move from three shifts to two with higher output. The savings are about ₹14 lakh every month.”
L Krishnan
MD, TaeguTec India
“The subscription cost is negligible compared to the returns — about 25×. Our daily production meetings dropped from 90 minutes to 20 minutes.”
Deepak Pinto
MD Zenith Precision
“Shift-change downtime was 2.5 hours a day. With Leanworx, it came down to 30 minutes. That saves us about ₹12 lakh a month across 60 machines.”
Deepak Pinto
MD Zenith Precision
“Shift-change downtime was 2.5 hours a day. With Leanworx, it came down to 30 minutes. That saves us about ₹12 lakh a month across 60 machines.”
L Krishnan
MD, TaeguTec India
“The subscription cost is negligible compared to the returns — about 25×. Our daily production meetings dropped from 90 minutes to 20 minutes.”
Gavin Price
MD Aarant Engineering
“Leanworx helped us move from three shifts to two with higher output. The savings are about ₹14 lakh every month.”