We’ve seen a lot of OEE improvements because now we can understand the parts, the spindle runtime, how effectively we are running. It’s actually helped us to move from 3 shifts down to 2 shifts with more output. So we’ve moved from about 30% spindle utilization to now over 55% spindle utilization.
Gavin Price
MD Aaran1 Engineering
Our downtime has decreased by 10%. The downtime, especially in the night shift, has reduced by more than 25%, which is a very, very important thing for us and is contributing a lot towards our productivity.
Deepak Pinto
MD Zenith Precision
Overall, I see at least 8 to 10% efficiency improvement, especially OEE and the spindle run time. Setup time has been reduced and we can see an improvement of at least 10 to 12% production improvement.
B.T. Umesh
DGM, CIM Tools
It takes hardly 10 minutes for a person to connect to the machine. I can tell you that we are able to reduce the downtime, and we are able to improve productivity. The middle level supervisors and managers are also satisfied with the exact data that they are getting from the Leanworx system.
Gurpreet Singh
MD, Pal Shell Cast
With Leanworx we have been able to bring down our machine downtime by about 30% and increase in OEE by 10 to 15%, which is a huge saving. We have been getting fantastic results out of it. The reports that we generate every morning give us a good insight on the productivity and the performance of the operator as well as the machine.
Sanjay Desai
CEO, RBD Engineers
After implementing Leanworx we are no longer discussing the quality of data or accuracy of data. Discussion revolves around what can be done to improve productivity. Looking at the benefit of utilizing and improving the equipment utilization, the incremental cost that we incur by paying the subscription is very small and it's a good value proposition from our point of view.
L Krishnan
MD, TaeguTec India
When a customer asks, What is your OEE? We say 85%. Are we really at 85%? I don't think so. After installing Leanworx and improving systems, it's 88 when we finally checked the last time. So that's a substantial advantage.
Anil Machani
Director & President – Operations, SSS Springs